The project is still planned
As a general rule, the procedure must start before the commitments are made and the project begins. We check the deadline first.
Energy efficiency / White certificates
We help to assess whether the planned energy efficiency reduction modernisation can enter the energy efficiency certification system. We organize the data, audit and documentation before the start of the investment.
Initial qualification
White certificate is not an automatic grant for every upgrade. There is a need for measurable energy savings, an appropriate time to submit an application and documentation in accordance with the requirements of the system.
As a general rule, the procedure must start before the commitments are made and the project begins. We check the deadline first.
The reference point, method of calculation and assumptions must show savings in final energy in a measurable way.
We verify the type of modernization, qualification conditions and availability of data needed for audit.
The consistency of the audit, design and proposal reduces the risk of questions, corrections and delays in proceedings.
Value to the investor
Client receives a reliable project assessment and documentation that combines technology, energy and procedure requirements.
See scope of technical auditThe project can be ordered or stopped before unnecessary documentation costs arise.
The assumptions, input data and result are understandable to the investor and project assessors.
Audit, technical description and schedule of the project talk about the same scope.
We help answer technical questions and order the required additions.
How we work
Every stage has a checkpoint. If the project does not meet the basic conditions, the client will learn about it before expensive documentation work.
EntryDescription of retrofitting and energy data
We know the scope of the investment, the expected schedule, energy consumption and available technical data.
We determine the reference state, the option after modernization and the method of calculating final energy.
We prepare or order an energy efficiency audit and the materials needed for the proposal.
We help in explanations and additions, and after implementation we order the data needed to confirm the effect.
ResultComplete conclusion and impact confirmation plan
Assessment data
In the first stage we do not need a ready-made audit. Just a description of the planned change and data to estimate the scale of savings.
What is to be replaced, modified or optimised and what technical problem the project solves.
Energy consumption, working hours, load, device parameters and historical data available.
Offer, design, device cards, assumed parameters and planned implementation date.
Scheduled contracts, contracts and the start of work which may be relevant to the correct order of procedure.
FAQ
The most important issues worth explaining before signing contracts and starting modernisation.
A white certificate is an energy efficiency certificate issued by the President of the Polish Energy Regulatory Office (URE). It confirms the final energy savings achieved by a project, and the associated property rights may have economic value.
In principle, before the start of the project. The moment of conclusion of the contract, placing an order or starting work may be important, so the timetable needs to be verified before undertaking.
No. The project must meet the conditions resulting from the rules and current rules of the system, and savings should be confirmed by audit. The initial qualification allows you to assess this before preparing the complete documentation.
Maybe if the planned action leads to measurable savings in final energy and meets the requirements of the system. Each case requires a separate assessment of the scope, reference point and way of confirming the effect.
No. The President of the Polish Energy Regulatory Office (URE) decides whether to issue the certificate. Our role is to provide a reliable technical assessment, prepare the calculations and documentation, and support the client throughout the procedure.
Before the work begins
A short pre-qualification will assess the scope, data and proper sequence of further actions.