Case study / Fish processing

Evapco. Performance without replacing the device.

The hard scale on the coil reduced heat exchange and increased the risk of production disruption. We performed chemical cleaning without dismantling and then set up a permanent system protection program.

Discuss a similar system Back to implementation
  • Evapco condenser
  • Cleaning without dismantling
  • Permanent protection of circulation
Go to course

Which required a decision.

Continuity of cooling.Safe decision.

Removing the visible deposit was not enough. We also had to assess the material, the type of scale and the conditions required to clean the system safely.

Tough scale on the coil

The sediment reduced the area of heat exchange and reduced the effectiveness of the condenser.

Heat exchange

Increasing system load

In order to maintain temperatures, the installation worked to an increasingly less favorable extent.

Energy consumption

Risk of production

Worse cooling in the food plant increases the risk of disrupting the process.

Continuity of work

Workflow

Clean surface.It was security.

The sequence of actions was important: first the diagnosis and safe chemical process, then the way that limits the return of sediment.

  1. Inspection and analysis of water

    We assessed the condition of the coil, the type of sediment and the parameters of the cooling water.

  2. Testing and selection of the process

    We have determined the treatment product, the contact time and the method of washing suitable for the installation material.

  3. Chemical cleaning

    The process removed sediment without dismantling the device and exposed heat exchange surfaces.

  4. Programme for the following period

    dosing and monitoring help to reduce conditions conducive to the scale redeposition.

What changed in the installation

We confirm the efficiency of the arrangement, not the appearance.

After cleaning we verify the operation of the system, the reaction of water parameters and whether the protection program is ready to work in variable load production.

Purified

exchange surfaces

Before

hard deposit on coil

After

exposed and ready to work

Recovered

cooling efficiency

Before

limited by scale

After

process tested

Fixed

Protection of circulation

Before

no coherent programme

After

dosing and monitoring of parameters

A description of the work. Numeric parameters are published only after confirmation of measurements and customer approval.

What keeps the effect

Effect after cleaning.Permanent security.

Together with the team of the plant, we determine parameters, control points, and response methods before the sediment begins to reduce cooling again.

  1. Water fit for installation

    The selection of the programme takes into account the quality of make-up water, materials and condenser working conditions.

  2. Cleaning without guessing

    The chemical process precedes the assessment of sediment and risks, and after it we perform flushing and control of effect.

  3. Surveillance in production

    Constant monitoring allows you to adjust the program when the load changes or the operating season of the system.

Implementation FAQ

Before cleaning.What is to be determined?

Safe cleaning requires evaluation of the installation, not just the choice of the treatment product.

Does chemical cleaning always require the condenser to be dismantled?

Not always. The possibility of cleaning without dismantling depends on the construction of the installation, the type of sludge, materials and access to circulation. We assess each case before starting work.

How do you protect the system after scale removal?

After cleaning, we select the conditioning program and determine the range of water control. This reduces the conditions that favoured the formation of sediment before intervention.

Can the work be scheduled to minimize its impact on production?

Yes. The scope and schedule are determined after risk assessment and available service windows. In plants with continuous production, it is particularly important to stage and prepare the process in advance.

A similar subject at the bet?

Let's see if performance can be recovered without replacing the device.

Describe the condenser type, symptoms and working conditions. The engineer will help determine from which measurements and inspection to start.

Write to engineer +48 662 792 875